[1] Sloan, D. (1983). “Mine Management, Chapman and Hall”. London, ISBN 041224070X: 495.
Topal, E. (2008). “Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling”. Journal of the South African Institute of Mining and Metallurgy, 108: 99-107.
Ahmed, H. M., Eberhardt, E., and Dunbar, W. S. (2014). “Interaction between block caving and rock slope deformation kinematics as a function of cave position and orientation of discontinuities”. Mining Technology, 123: 140-148.
Susaeta, A., Rubio, E., Henríquez, J., and Pais, G. (2008). “Dilution behaviour at Codelco panel cave mines”. 5th International Conference and Exhibition on Mass Mining, Lulea Sweden, 9-20.
Verdugo, R., and Ubilla, J. (2004). “Geotechnical analysis of gravity flow during block caving”. Professor of Geotechnical Engineering, University of Chile, Chile, 195-200.
Brown, E. T. (2003). “Block caving geomechanics”. 1st Ed., Julius Kruttschnitt Mineral Research Centre, The University of Queensland Australia, pp. 515.
Rubio, E. (2006). “Block cave mine infrastructure reliability applied to production planning”. NR13037 Ph.D., The University of British Columbia, Canada, pp. 142.
Alford, C., Brazil, M., and Lee, D. (2007). “Optimization in Underground Mining”. In Handbook Of Operations Research In Natural Resources, Weintraub, A., Romero, C., Bjorndal, T., Epstein, R., and Miranda, J. Eds., Springer US., 561-577.
Chanda, E. K. C., and Dagdelen, K. (1995). “Optimal blending of mine production using goal programming and interactive graphics systems”. International Journal of Surface Mining, Reclamation and Environment, 9(4): 203-208.
Pourrahimian, Y., Askari-Nasab, H., and Tannant, D. (2013). “A multi-step approach for block-cave production scheduling optimization”. International Journal of Mining Science and Technology, 23(5): 739-750.
Maybee, B. M. (2011). “A Risk-based Evaluation Methodology for Underground Mine Planning”. NR71893 Ph.D, Laurentian University, Canada, pp. 172.
Riddle, J. (1976). “A Dynamic Programming Solution of a Block - Caving Mine Layout”. In Proceedings APCOM, International Symposium on the Application of Computers and Operations Research in the Minerals Industries, 767-780.
Song, X. (1989). “Caving process simulation and optimal mining sequence at Tong Kuang Yu mine”. China, 386-392.
Chanda, E. C. K. (1990). “An application of integer programming and simulation to production planning for a stratiform ore body”. Mining Science and Technology, 11(2): 165-172.
Guest, A. R., Van Hout, G. J., and Von Johannides, A. (2000). “An Application of Linear Programming for Block Cave Draw Control”. MassMin. Brisbane, Australia, the Australasian Institute of Mining and Metallurgy, 461-468.
Smith, M. L., and Rahal D. (2001). “Draw Control Optimisation in the Context of Production Scheduling”. 17th International Mining Congress and Exhibition of Turkey- IMCET2001, Turkey, 831-838.
Rubio, E. (2002). “Long term planning of block caving operations using mathematical programming tools”. Mining and Mineral Process Engineering, the University of British Columbia, Master of Applied Science, pp. 126.
Epstein, R., Goic, M., Weintraub, A., Catalan, J., Santibanez, P., Urrutia, R., Cancino, R., Gaete, S., Aguayo, A., and Caro, F. (2012). “Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines”. Operations Research, 60(1): 4-17.
Rahal, D., Smith, M., Smoljanovic and Hout, G., and Von Johannides, A. (2003). “The use of mixed integer linear programming for long-term scheduling in block caving mines”. Application of Computers and Operations Research ill the Minerals Industries, South African Institute of Mining and Metallurgy, 123-132.
Smoljanovic, M., Rubio, E., and Morales, N. (2011). “Panel Caving Scheduling Under Precedence Constraints Considering Mining System”. 35th APCOM Symposium, Wollongong, NSW, Australia, 407-417.
Pourrahimian, Y., Askari-Nasab, H., and Tannant, D. (2012). “Mixed-Integer Linear Programming formulation for block-cave sequence optimization”. International Journal of Mining and Mineral Engineering, 4(1): 26-49.
Pourrahimian, Y., and Askari-Nasab, H. (2014). “An application of mathematical programming to determine the best height of draw in block-cave sequence optimization”. Mining Technology (Mining Technology IMM Transactions Section A), 123(3): 162-172.
Alonso-Ayuso, A., Carvallo, F., Escudero, L. F., Guignard, M., Pi, J., Puranmalka R., and Weintraub, A. (2014). “Medium range optimization of copper extraction planning under uncertainty in future copper prices”. European Journal of Operational Research, 233(3): 711-726.
Nezhadshahmohammad, F., Aghababaei, H., and Pourrahimian, Y. (2017). “Conditional draw control system in block-cave production scheduling using mathematical programming”. International Journal of Mining, Reclamation and Environment, 33(4): 1-24.
Nezhadshahmohammad, F., Pourrahimian, Y., and Aghababaei, H. (2018). “Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling”. International Journal of Mining Science and Technology, 28(6): 941-950.
Rahal, D. (2008). “Draw Control in Block Caving Using Mixed Integer Linear Programming”. Ph.D, the University of Queensland, pp. 342.
[27] نژادشاه محمد، ف.، فتحی، م. ب.؛ 1398؛ "ارائه روشی برای کنترل راستای پیشروی استخراج تخریب بلوکی". نشریه علمی مهندسی منابع معدنی، دوره پنجم، شماره1، ص 57-41. DOI: 10.30479/jmre.2019.10359.1246.