[1] Guglielmetti, V., Grasso, P., Mahtab, A., and Xu, S. (2008). “Mechanized tunnelling in urban areas: design methodology and construction control”. CRC Press.
[2] Hamidi, J. K., Shahriar, K., Rezai, B., Rostami, J., and Bejari, H. (2010). “Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP”. Bulletin of Engineering Geology and the Environment, 69: 523-532.
[3] Shahriar, K., Sharifzadeh, M., and Hamidi, J. K. (2008). “Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions”. Tunnelling and Underground Space Technology, 23: 318-325.
[4] USA- UCA of SME- Underground Construction Association of SME (www.uca.smenet.org).
[5] Raz, T., and Michael, E. (2001). “Use and bene_ts of tools for project risk management”. International Journal of Project Management, 19(1): 9-17.
[6] Eskesene, S. D. (2004). “Guidelines for tunneling risk management: International Tunnelling Association”. Working Group No. 2 Tunneling and Undergruond Space Technology, 19: 217-237.
[7] Gharari, N. (2007). “Risk Assessment in Tunneling With TBM Using FMEA Method And Temporary Ventilation Design”. Unpublished Case Study, University of Shahid Beheshti (MS), Tehran, Iran.
[8] Hoek, E., and Palmeiri, A. (1998). “Geotechnical risks on large civil engineering projects”. International Association of Engineering Geologists Congress, Vancouver, Canada.
[9] Holicky, M. (2008). “Risk assessment and optimization of road tunnels”. R&RATA 4, vol. 1.
[10] Barton, N. (2012). “Reducing risk in long deep tunnels by using TBM and drill-and-blast methods in the same project–the hybrid solution”. Journal of Rock Mechanics and Geotechnical Engineering, 4(2): 115-126.
[11] Yazdani-Chamzini, A., Haji Yakhchali, S., and Mahmoodian, M. (2013). “Risk ranking of tunnel construction projects by using the ELECTRE technique under a fuzzy environment”. International Journal of Management Science and Engineering Management, 8(1): 1-14.
[12] Fouladgar, M. M., Yadani-Chamzini, A., and Basiri, M. H. (2011). “Risk evaluation of tunneling projects by fuzzy topsis”. In International Conference on Management, 1: 1219-1232.
[13] صیادی، ا. ر.، حیاتی، م.، منجزی، م.؛ 1390؛"مدیریت ریسک در تونل ساخت با استفاده از تکنیکهای MADM". نشریه مدیریت صنعتی (دانشکده مدیریت دانشگاه تهران)، دوره سوم، شماره 7، ص 99-116.
[14] شرکت مهندسی جنرال مکانیک-سابیر، با همکاری مهندسین مشاور ایران استن؛ 1396؛ گزارش فنی پروژه آزادراه تهران- شمال(تونل غربی البرز)، تهران، ایران.
[15] عطائی، م.؛ 1388؛"تصمیم گیری چند معیاره فازی". چاپ اول، انتشارات دانشگاه صنعتی شاهرود، شاهرود.
[16] عطائی، م.؛ 1395؛ "مدیریت ریسک". چاپ اول، انتشارات دانشگاه صنعتی شاهرود، شاهرود.
[17] Chia-Chi, S., and Grace T. R. L. (2009). “Using fuzzy TOPSIS method for evaluating the competitive advantages of shopping websites”. Expert Systems with Applications, 36(9): 11764-11771.
[18] Malakouti, M., Faizi, M., Hosseini, S. B., and Maleki, S. N. (2018). “Evaluation of flexibility components for improving housing quality using fuzzy TOPSIS method”. Journal of Building Engineering, 22: 154-160.
[19] Ranjbar, H. R., and Nekooie, M. A. (2018). “An improved hierarchical fuzzy TOPSIS approach to identify endangered earthquake-induced buildings”. Engineering Applications of Artificial Intelligence, 76: 21-39.
[20] Önüt, S., and Soner, S. (2008). “Transshipment site selection using the AHP and TOPSIS approaches under fuzzy environment”. Waste Management, 28(9): 1552-1559.
[21] Rouhani, S., Ghazanfari, M., and Jafari, M. (2012). “Evaluation model of business intelligence for enterprise systems using fuzzy TOPSIS”. Expert Systems with Applications, 39(3): 3764-3771.
[22] Hatami-Marbini, A., and Tavana, M. (2011). “An extension of the Electre I method for group decision-making under a fuzzy environment”. Omega, 39(4): 373-386.
[23] Aytac, E., Tus, I. A., and Kundakci, N. (2011). “Fuzzy ELECTRE I Method for Evaluating Catering Firm Alternatives”. Ege Academic Review, 11: 125-134.
[24] Hatami, A., and Tavana, M. (2011). “Extension of the Electre I method for group decision-making under a fuzzy environment”. Omega, 39: 373-386.
[25] Zak, J., and Kruszynski, M. (2015). “Application of AHP and ELECTRE III/IV methods to multiple level, multiple criteria evaluation of urban transportation projects”. Transportation Research Procedia, 10: 820-830
[26] Almeida, A. T. (2007). “Multicriteria decision model for outsourcing contracts selection based on utility function and ELECTRE method”. Computers & Operations Research, 34: 3569-3574.
[27] Cavallaro, F. (2010). “A comparative assessment of thin-filmphotovoltaic production processes using the ELECTRE III method”. Energy Policy, 38: 463-474.
[28] Chen, C. T., and Hung, W. Z. (2008). “Applying fuzzy linguistic variable and ELECTRE method in R&D project evaluation and selection”. IEEE International Conference on Industrial Engineering and Engineering Management (IEEM 2008), IEEE, Singapore, 999-1003.
[29] عطائی، م.؛ 1388؛ "تصمیمگیری چند معیاره". چاپ اول، انتشارات دانشگاه صنعتی شاهرود، شاهرود.