[1] Koyam, Y. (2003). “Present status and technology of shield tunneling method in Japan”. Tunnelling and Underground Space Technology, 18(2): 145–159.
[2] Tang, M., Deng, K., Wang, L., and Chen, X. (2012). “Research on natural frequency characteristics of thrust system for EPB machines”. Automation in Construction, 22: 491–497.
[3] Jain, P., Naithani, A. K., and Singh, T. N. (2014). “Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps – A case study”. Journal of Rock mechanics and Geotechnical Engineering, 6(1): 36–47.
[4] Tóth, Á., Gong, Q., and Zhao, J. (2013). “ Case studies of TBM tunneling performance in rock–soil interface mixed ground”. Tunnelling and Underground Space Technology, 28:140–150.
[5] Yagiz, S. (2007). “Utilizing rock mass properties for predicting TBM performance in hard rock condition”. Tunnelling and Underground Space Technology, 23 (3): 326–339.
[6] Yagiz, S., and Karahan, H. (2011). “Prediction of hard rock TBM penetration rate using particle swarm optimization”. International Journal of Rock Mechanics and Mining Science, 48, 427–433.
[7] Hamidi, J. K., Shahriar, K., Rezai, B., and Rostami, J. (2010). “Performance prediction of hard rock TBM using Rock Mass Rating (RMR) System”. Tunnelling and Underground Space Technology, 25, 333–345.
[8] Laughton, C. (1998). “Evaluation and Prediction of Tunnel Boring Machine Performance in variable rock Masses”. PhD Thesis, University of Texas.
[9] Frough, O., and Torabi, S. R. (2013). “An application of rock engineering systems for estimating TBM downtimes”. Engineering Geology, 157: 112–123.
[10] Frough, O., Torabi, S. R., and Tajik, M. (2012). “Evaluation of TBM utilization using rock mass rating system: a case study of Karaj-Tehran water conveyance tunnel (lots 1 and 2)”. Journal of Mining and Environment, 3(2): 89–98.
[11] Dhillion, B. S. (2008). “Mining Equipment Reliability, Maintainability and Safety”. Springer-Verlag London Limited, pp. 209.
[12] Amini Khoshalan, H., Torabi, S. R., Hoseinie, S. H., and Ghodrati, B. (2014). “An introduction to RAM analysis of EPB tunnel boring machine”. Scientific Journal of Pure and Applied Sciences, 3(3): 120-127.
[13] Kumar, U., and Granholm, S. (1988). “Reliability Technique: A Powerful Tool for Mine Operator”. Mineral Resource Engineering, 1: 13–28.
[14] Biały, W. (2013). “The effect of experimental research on the durability and reliability of mining equipment”. ZeszytyNaukowe, 34(106): 27–34.
[15] Vayenas, N., and Peng, S. (2014). “Reliability analysis of underground mining equipment using genetic algorithms A case study of two mine hoists”. Journal of Quality in Maintenance Engineering, 20(1): 32–50.
[16] Smith, D. J. (2005). “Reliability, Maintainability and Risk”. Elsevier Butterworth-Heinemann, pp. 346.
[17] Barabady, J. (2007). “Production Assurance: Concept, Implementation and Improvement”. Doctoral thesis, Division of Operation and Maintenance Engineering, Luleå University of Technologyو pp. 139.
[18] NFM Technologies. (2007). “Operating and maintenance manual for EPB TBM for Tabriz”. Tabriz Urban Railway Organization, pp. 288.
[19] Ascher, H., and Feingold, H. (1984). “Repairable system reliability”. Marcel Dekker, New York, pp. 223.
[20] Hall, R., and Daneshmend, L. K. (2003). “Reliability Modelling of Surface Mining Equipment: Data Gathering and Analysis Methodologies”. International Journal of Surface Mining, Reclamation and Environment, 17(3): 139–155.
[21] Barabady, J., and Kumar, U. (2008). “Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran”. Reliability Engineering and System Safety, 93, 647–653.
[22] Kumar, U. (1990). “Reliability analysis of load-haul-dump machines”. Doctor’s Thesis, Lulea University of Technology.